Project: Design of a G+1 Manufacturing unit

Our team had designed a factory building in late 2021. The project had two production areas on the ground floor separated by a covered 25′ common area. There was a pantry/canteen where workers can eat their lunch and afternoon tea. The facility also included administration and office space of the company

Front Elevation

The front section has a security booth and parking space. Three sides of the factory building have wide open spaces to allow easy movement of vehicles and people. There is also a loading platform at the south side beside Production 2 Facility.

Read more